HomeHelpSearchCalendarLoginRegister

Welcome, Guest. Please login or register.
March 14, 2010, 03:08:55 PM

Login with username, password and session length
Search

News
Found Dog 2/26 at Hampton and Columbia.

Click here to see me.
+  Clifton Heights of St. Louis Missouri
|-+  Neighborhood Association
| |-+  Clifton Heights Neighborhood Association (CHNA)
| | |-+  CHNA Forum
| | | |-+  MetroLink Extension Northside-Southside Study Final Newsletter
0 Members and 1 Guest are viewing this topic. « previous next »
Pages: [1] Print
Topic: MetroLink Extension Northside-Southside Study Final Newsletter  (Read 435 times)
George
Administrator
Clifton Member

Posts: 744



View Profile WWW
« on: April 13, 2008, 10:53:59 AM »


Potential MetroLink Extension Selected for St. Louis City

The Board of Directors of the East-West Gateway Council of Governments, our region’s metropolitan planning agency, has approved a potential MetroLink extension in the City of St. Louis. The board’s vote means that if or when light rail is expanded in the City, this is the route that should be considered. The approved extension, known in transit planning as a locally preferred alternative, would travel in the street, except along the I-55 right-of-way, as follows:
• From I-70 north near the Goodfellow Avenue exit south to Natural Bridge;
• East to North Florissant, south on 14th Street into Downtown;
• East on Convention Plaza, south to 10th Street, west on Clark, south to 14th Street; and
• West on Chouteau Avenue, exit south onto Jefferson, to Broadway exit to I-55 right-of-way and terminating at Bayless/I-55.
A separate set of tracks would move passengers, in the opposite direction, from south to north.

Read more >>>

« Last Edit: April 13, 2008, 11:04:50 AM by George » Logged

Pages: [1] Print 
« previous next »
Jump to:  

Powered by SMF 1.1.7 | SMF © 2006-2008, Simple Machines LLC
Amber design by Bloc | XHTML | CSS